
preparation
Açaí Berry Washing & Sorting Equipment
Specify the wash action, water circuit and inspection handover for whole açaí berries before seed separation.
Inlet: Whole açaí berries; state prior sorting and washingIndustrial process equipment
Explore the machine, its duty and the conditions that define the right configuration. Choose one module or a connected process.
15 equipment duties and configurations

preparation
Specify the wash action, water circuit and inspection handover for whole açaí berries before seed separation.
Inlet: Whole açaí berries; state prior sorting and washing
extraction
Configure whole-berry extraction around seed integrity, water addition, pulp finish and a measured product trial.
Process inlet: Prepared whole berries, with measured water where specified
extraction
Select a finishing stage using retained material, product texture and the actual pulp feed conditions.
Feed: Extracted or purchased pulp at stated temperature
handling
Define usable hold-up, product residence and transfer duty between extraction, blending, treatment and filling.
Sizing basis: Cumulative inflow / outflow and permitted process delay
handling
Translate a declared recipe into batch size, ingredient addition, mixing, sampling and downstream handover.
Inlet: Specified pulp and declared recipe ingredients
preservation
Specify the product, flow range, validation boundary and filling handover before selecting thermal equipment.
Required input: Product specification, flow range, inlet conditions and target route
preservation
Connect treated pulp, sterile transfer, compatible bag fitments and package-integrity acceptance in one filling scope.
Product inlet: From a validated upstream aseptic process
handling
Map cleanable circuits, manually cleaned parts, utility duties and verification before specifying a cleaning system.
Operating state: Independent from product productionhandling
Match receiving, pack opening and hygienic preparation to frozen, chilled or aseptic pulp supply.
preservation
Define pack handling, fill duty and downstream freezing or customer receipt as connected project interfaces.

handling
Specify the pump, suction, pipework, connections and controls as one circuit around the actual pulp.
Scope: Source, pump, pipework, valves, controls and receiverpreparation
Build an observable whole-berry inlet with defined unloading, acceptance, reject removal and feed control.
preparation
Define the condition required for pulping and distinguish fresh-fruit preparation from frozen whole-berry handling.

preparation
Specify a controlled whole-fruit lift by receiving height, discharge height, feed pattern and cleaning access.
Equipment family: Generic fruit / vegetable scraper elevatorpreparation
Plan an accessible manual inspection table or configured conveyor before whole-berry preparation and pulping.
Start at fruit reception. Separate the seed without treating the berry as a conventional juice-pressing duty.
Explore the route ↗02Frozen whole berries still contain seeds. They need a preparation plan before separation; they are not equivalent to frozen pulp.
Explore the route ↗03Start after extraction. Match receiving, screening and blending to the pulp specification and packaging already in use.
Explore the route ↗Equipment selection
Share your raw material, pulp target and packaging requirements.