Alternative inlet / Equipment module
Purchased pulp receiving
Enter the line after whole-fruit extraction.
Functional schematic · not a model drawing
The process duty
Record the supplier’s pulp specification, packaging, prior treatment and delivery condition. For frozen blocks, define hygienic opening and preparation. For aseptic supply, decide whether opening the package changes the intended sterile boundary.
- Inlet
- Frozen, chilled or aseptically packed pulp
- Outlet
- Released pulp for the agreed finishing route
Specification & acceptance checks
| Item | What to confirm |
|---|---|
| 01 | Pulp packaging and handling method |
| 02 | Supplier specification and traceability |
| 03 | Total solids, added water and ingredient declaration |
| 04 | Treatment status and receiving criteria |
The project proposal identifies the actual model, capacity and utility conditions. No generic rating is presented as a verified product specification.
Position in the line
Pulp supplier
Purchased pulp receiving
Prepare the next decision
Use the trial checklist to connect product observations to a measurable acceptance schedule.
Read the trial and acceptance guide →